Studies

Year Event Description
Late 1800s Discovered River Jordan or King Fissure deposit.
1895, 1896, 1898 Mentioned in Ministry of Mines reports.
1956 Conducted sampling and trenching program by American Standard Mines Ltd.
1958 Bunker Exploration Ltd. performed trenching program.
1961 MINFILE reported “measured geological reserves” of 2.6 million tonnes grading 37.7 g/t silver, 5.1% lead, and 5.6% zinc.
1963, 1965, 1966 Drilled 11 holes totaling 15,874 feet (4,838 m).
2008 Silver Phoenix conducted mapping and sampling program.
August, 2008 Conducted geologic mapping, rock sampling, and magnetometer survey by Discovery Consultants.
2009 Precision GeoSurveys Inc. carried out airborne magnetics and radiometrics survey.
August, 2010 Performed soil and rock sampling program.
August, 2012 Site visit and property assessment by James A. Turner.
2013 Recommended two-phase exploration program including data compilation, mapping, geochemical sampling, and geophysics surveys.
2015 Drill Program – 1 NQ hole (494 m) by Silver Phoenix.  9 core samples submitted for assay by Activation Laboratories Ltd.
January 12, 2016 Date of Statement of Work – 5586198.
March, 2016 Assessment report prepared and submitted by Donald Penner, P. Geo.
October, 2023 John Cheng, P. Eng. completed acquisition from Bill Murray of Silver Phoenix all River Jordan related assets.
2024 Field program conducted summer 2024 to affirm prospect of economical mineral deposit.
Historical and Current Timeline of Project X #001 – River Jordan (2024)

 
 

Click Here to View: James T. Fyles Report